Date Started
June 2016
Date completed
November 2018
Client name
Sawyers Windows and Construction Ltd
Client type
Builder / Developer
Collaborators
Homeowner
Brief synopsis
- Structural design of new commercial light industrial units at Durranhill
- Drainage analysis and design including remedial works to existing site drainage
Budget allocated to Kingmoor
£3,500
Key challenges
- Former use of the site impacted on available space for foundations.
- Legacy of drainage crossing the site from adjacent properties required careful consideration and construction.
Total project cost
TBC