Date started

January 2017

Date completed

Ongoing

Client name

Lattimer Homes

Client type

Builder / Developer

Collaborators

Alpha Design

Brief synopsis

  • Residential development in the village of Blencogo.
  • Assisted in the onsite drainage design, earthworks and detailed geotechnical studies associated with the 7 unit green field site.
  • Onsite works included percolation tests, drainage design, liaison with United Utilities to establish limits on available drainage discharge.

Budget allocated to Kingmoor

£1,500

Key challenges

Working with stakeholders to establish appropriate levels of discharge from the site for the drainage system, including localised attenuation.

Solutions developed

Onsite geotechnical, drainage and structural design of the development.

Total project cost

Confidential